WEIYE SEPAT SF-101 Multi-tube Options Gold-Tubed Halogen Carbon Fiber Ruby-Coated Halogen IP65
Halogen golden color light tube. Material is aluminum alloy body.Special spraying treatment and toprevent rust and corrosion will provide you comfortable and satisfying experience.Product Size is 51*8cm and easily installed.
Description
Specifications:
230V Heat Settings | 1 pc Gold-Tubed Halogen:230V-1000W(UK/EU),1pc Ruby-Coated Halogen:230V-1500W(UK/EU),1 pc Carbon Fiber:230V-1000W(UK/EU) |
110V Heat Settings | 1 pc Gold-Tubed Halogen:110V-1500W(US), |
Heating Element | Gold-Tubed Halogen/ Carbon Fiber/ Ruby-Coated Halogen |
Control Type | Mechanical |
Safety | Safety Mesh |
Material | Aluminum Alloy Body |
Waterproof Level | IP65 |
Wire Length | 2/3M |
Weight (kg) | 1.7/2 |
Product Size (cm) | 51*8 |
Carton Size (cm) | 55*14*11.5(0.01CBM) |
Loading Qty 20'/40'HQ | 3111/7555 |
Applications:
Bathroom, Bedroom, Garden, Living Room
Advantages:
It has two ways to be installed. One can be on the wall. The other one is with stand. A variety of lamps are available
FAQ:
Q1.When can i get the quotation?
A: We usually quote within 24 hours after we get your inquiry.
Q2: Can you do the design for us?
A: Yes. but MOQ will be required.
Q3: How long can i expect to get the samples?
A: After the payment, the sample will be ready for delivery in 7-10 days
Q4:What about the lead time of mass production?
A: Honestly.lt depends on the order quantity and the season you place the order. The lead time of MOQ is about 30 to 40 days.
Q5:Do you have inspection procedure before shipping?
A:Yes, we do.100% QC inspection before shipment.
Q6: How about the FOC spare parts, can be offered with order?
A: We offer easily broken parts about 1% of order quantity.Main componentlike PCB,MOTOR offer 0.5%
Q7:Payment Term
A:T/T 30% deposit in advance, 70% against copy of B/L L/C:An irrevocable L/C at sight
Q8:Delivery Time
A:15 days after receipt of payment 35-40 days after order confrmation