All Categories

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
weiye sepat sf 20tdc china factory portable dc solar air cooler evaporative cooling fan solar air cooler-0

Rechargeable Air Coolers

Home >  Products >  Rechargeable Air Coolers

WEIYE SEPAT SF-20TDC China Factory Portable DC Solar air Cooler Evaporative Cooling Fan Solar air Cooler

Model: SF-20TDC
Material of machine: ABS
Color: Blue-Gray
Motor: Copper Motor
Type of Battery: lead-acid batteries
Power of Solar panel: 200W
MOQ(Pcs): 5 Pcs

Description

Specifications:

40HQ Loading Qty (sets) 485 pcs
Battery capacity 24V20AH
Cooling Area 10-25m²
Control Type Mechanical
Biggest Airflow 3000m³/h,Stepless speed
Wind Distance 5-8M
Voltage Power DC(24V)/75W
Water Tank 20L
Carton Size(L*W*H) Cooler525*300*660mm(0.103CBM)/Stand515*400*150mm(0.03CBM)
Product N.W 23.21kg
Product G.W 24.43kg
Solar Charging Time 4-6 hours
Solar Carton Size(L*W*H) 850*1620*80mm(0.11CBM)
Solar Carton N.W 13kg

Applications:

SF-20TDC is very suitable for indoor and outdoor like house ,camping and party.

Advantages:

SF-20TDC is lightweight and easy to carry, with easy installation and removal of the stand and the machine.Its low energy consumption helps customers save on electricity bills.Its built-in rechargeable battery can maintain normal operation of the machine for 8-25 hours when fully charged, greatly meeting the normal use requirements of customers in power-scarce countries and regions.

FAQ:

Q1.When can i get the quotation?
A: We usually quote within 24 hours after we get your inquiry.

Q2: Can you do the design for us?
A: Yes. but MOQ will be required.

Q3: How long can i expect to get the samples?
A: After the payment, the sample will be ready for delivery in 7-10 days

Q4:What about the lead time of mass production?
A: Honestly.lt depends on the order quantity and the season you place the order. The lead time of MOQ is about 20-30 days.

Q5:Do you have inspection procedure before shipping?
A:Yes, we do.100% QC inspection before shipment.

Q6: How about the FOC spare parts, can be offered with order?
A: We offer easily broken parts about 1% of order quantity.Main componentlike PCB,MOTOR offer 0.5%

Q7:Payment Term
A:T/T 30% deposit in advance, 70% against copy of B/L L/C:An irrevocable L/C at sight

Q8:Delivery Time
A:15 days after receipt of payment 35-40 days after order confrmation

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000