WEIYE SEPAT SF-50MDC Portable DC Solar air Cooler Evaporative Cooling Fan Solar air Cooler
Model: SF-50MDC
Material of machine: PP
Color: Brown/White
Motor: Cooper Motor
Type of Battery: lead-acid batteries
Power of Solar panel: 200W
MOQ(Pcs): 5 Pcs
Description
Specifications:
40HQ Loading Qty (sets) | 212 pcs |
Battery capacity | 24V20AH |
Cooling Area | 20-45m² |
Control Type | Mechanical |
Biggest Airflow | 4500mm³/h,3 speeds |
Wind Distance | 10M |
Voltage Power | 24V/125W |
Water Tank | 40L |
Carton Size(L*W*H) | 640*455*1085mm(0.316CBM) |
Product N.W | 28.5kg |
Product G.W | 31.8kg |
Solar Charging Time | 3.5-17hours |
Solar Carton Size(L*W*H) | 580*1050*80mm(0.049CBM) |
Solar Carton N.W | 5.6kg |
Applications:
SF-50MDC is very suitable for indoor and outdoor like house ,camping and party.
Advantages:
SF-50MDC is lightweight and easy to carry, and its pure copper motor significantly extends its lifespan. Its low energy consumption helps customers save on electricity bills. Its built-in rechargeable battery provides 4-17 hours of normal operation on a full charge, greatly meeting the needs of customers in countries and regions with limited access to electricity.
FAQ:
Q1.When can i get the quotation?
A: We usually quote within 24 hours after we get your inquiry.
Q2: Can you do the design for us?
A: Yes. but MOQ will be required.
Q3: How long can i expect to get the samples?
A: After the payment, the sample will be ready for delivery in 7-10 days
Q4:What about the lead time of mass production?
A: Honestly.lt depends on the order quantity and the season you place the order. The lead time of MOQ is about 30-40 days.
Q5:Do you have inspection procedure before shipping?
A:Yes, we do.100% QC inspection before shipment.
Q6: How about the FOC spare parts, can be offered with order?
A: We offer easily broken parts about 1% of order quantity.Main componentlike PCB,MOTOR offer 0.5%
Q7:Payment Term
A:T/T 30% deposit in advance, 70% against copy of B/L L/C:An irrevocable L/C at sight
Q8:Delivery Time
A:15 days after receipt of payment 35-40 days after order confrmation