WEIYE SEPAT SF-90DC CE AC/DC/solar/battery Mobile Evaporative air Cooler
Model: SF-90EDC
Material of machine: ABS
Color: White
Motor: Brushless Motor
Type of Battery: lead-acid batteries 
Power of Solar panel: 200W
MOQ(Pcs): 5 Pcs
Description
Specifications:
| 40HQ Loading Qty (sets) | 186 pcs | 
| Battery capacity | 24V20AH | 
| Cooling Area | 30-50m² | 
| Control Type | Remote | 
| Biggest Airflow | 5000m³/h,4 speeds | 
| Wind Distance | 15M | 
| Voltage Power | DC24V/165W | 
| Water Tank | 45L | 
| Carton Size(L*W*H) | 520*440*1540mm(0.35CBM) | 
| Product N.W | 42.5kg | 
| Product G.W | 44.5kg | 
| Solar Charging Time | 4-6 hours | 
| Solar Carton Size(L*W*H) | 850*1620*80mm(0.11CBM) | 
| Solar Carton N.W | 13kg | 
Applications:
This model is very suitable for the house ,office and restaurant
Advantages:
SF-90EDC is lightweight and portable, featuring a pure copper motor for a significantly longer lifespan. Its inner and outer oscillating blades expand the wind receiving area, and its dual air outlet design significantly increases airflow. Its intelligent remote control system also provides a convenient user experience. Its low-energy design effectively saves on electricity costs, and its built-in rechargeable battery can maintain normal operation for 4-18 hours, greatly meeting the needs of customers in power-scarce areas.
FAQ:
Q1.When can i get the quotation?
A: We usually quote within 24 hours after we get your inquiry.
Q2: Can you do the design for us?
A: Yes. but MOQ will be required.
Q3: How long can i expect to get the samples?
A: After the payment, the sample will be ready for delivery in 7-10 days
Q4:What about the lead time of mass production?
A: Honestly.lt depends on the order quantity and the season you place the order. The lead time of MOQ is about 30-40 days.
Q5:Do you have inspection procedure before shipping?
A:Yes, we do.100% QC inspection before shipment.
Q6: How about the FOC spare parts, can be offered with order?
A: We offer easily broken parts about 1% of order quantity.Main componentlike PCB,MOTOR offer 0.5%
Q7:Payment Term
A:T/T 30% deposit in advance, 70% against copy of B/L L/C:An irrevocable L/C at sight
Q8:Delivery Time
A:15 days after receipt of payment 35-40 days after order confrmation